USCG Hangar and Bridge Crane

ROLE: Principal contractor

DESCRIPTION: Design and Installation of a 5-Ton Bridge Crane Hanger
Repair Fire Suppression Systems and Water Tank
Weapons System Integration Facility Valve Isolation

DETAILS:
• Heavy Steel and Crane Construction
• Top Security Isolated Island Mobilization
• Large and Specialized Concrete Foundations
• Heavy Mechanical Piping
• Ship/Barge material and equipment shipping logistics
• Environmentally sensitive and historical archeological areas.

$3.5 million

Comments are closed.