PROJECTS

  • Aircraft Rescue & Firefighting Facility

    Aircraft Rescue & Firefighting Faci

    Role: General Contractor Description: The existing 30-year-old Aircraft Rescue and Fire Fighting (ARFF) facility at the Daytona Beach International Airport (DBIA) is being replaced by a new state-of-the-art facility. The new building will house fire services staff 24 hours a…

    Read more

  • Airport Terminal Improvements – Phase 3, Gates 7-10 Terminal Addition

    Airport Terminal Improvements – Ph

    Role: General Contractor Description: Site work and renovation of St. Pete-Clearwater International Airport in Clearwater, Florida. This project will almost double passenger hold room capacity in Gates 7 thru 10 to approximately 750 seats. This 10,000 to 12,000 square foot…

    Read more

  • C.A.R.E.  Chemical Addiction Rehabilitation Effort, Inc.

    C.A.R.E. Chemical Addiction Rehabilitat

    C.A.R.E. Chemical Addiction Rehabilitation Effort, Inc.  New Construction of Confined medical rehabilitation facility  

    Read more

  • Casa Verde

    Casa Verde

    ROLE: Design/Build Contractor PDESCRIPTION: "Casa Verde" is one of the first high performance green homes in South East United States. Project Executive Louis H. Sanchez, LEED Accredited Professional Professional Architect, Structural Engineer and Geotechnical Engineered and sealed design and drawings • 95% of…

    Read more

  • Eastside Health Services Building

    Eastside Health Services Building

    ROLE: Principal Contractor DESCRIPTION: Private/State funded medical, dental and alcohol detox facility remodeled approximately 39,000SF commercial retail building into various medical and dental office and minimum security alcohol/drug detox and rehabilitation facility specifically for low income and legally challenged families. $9,272,000.00

    Read more

  • Florida Department of Transportation Campus

    Florida Department of Transportation Cam

    ROLE: Principal Contractor DESCRIPTION: New construction of the PPTEMO and Right of Way Engineering Administrative offices. Three story facilities with elevators break areas, offices, structural steel framing, concrete, metal roofing system. Approximately 25,000SF with 350 space paring facility. $6,000,000.00

    Read more

  • Florida National Guard Armory Renovation

    Florida National Guard Armory Renovation

    Role: General Contractor Description: 12,000sf LEED Silver Renovation. The renovation will include removal and replacement of landscaping, demolition of exterior concrete slab for the construction of a new pre-engineered metal storage building, pressure washing all existing concrete parking and sidewalks,…

    Read more

  • Four Story Office Building

    Four Story Office Building

    ROLE: Construction Manager DESCRIPTION: New 4 story 30000 SF (60 x 125 foot print) mixed use office center building shell with lobby build out. New elevator, asphalt parking. Approx $200.00/SF $6,000,000.00 

    Read more

  • Historic Taft Building

    Historic Taft Building

    ROLE: Design Build Contractor DESCRIPTION: Artec performed in house Design Build renovations to the historic “Taft Building” built in 1923. Renovation to existing specialty aesthetic medical and cosmetic dental facilities consisting of heavy mechanical, electrical and power systems for specialty laser,…

    Read more

  • Homestead AFB, Fire Training Facility & Smoke House

    Homestead AFB, Fire Training Facility &#

    ROLE: Prime Contractor DESCRIPTION: This facility is an environmentally responsible 90,000 pound steel-framed aircraft mock-up in the center of a 100-foot-diameter burn area. The left wing of the mock-up is attached low to the fuselage to simulate a C-135 and most large…

    Read more

  • MacDill AFB, Fire Training Facility

    MacDill AFB, Fire Training Facility

    ROLE: Prime Contractor DESCRIPTION: This facility is an environmentally responsible 90,000 pound steel-framed aircraft mockup in the center of a 100-foot-diameter burn area. The left wing of the mock-up is attached low to the fuselage to simulate a C-135 and most large…

    Read more

  • MacDill Air Force Base Naval Reserve Training Center

    MacDill Air Force Base Naval Reserve Tra

    ROLE: Construction Manager DESCRIPTION: The Naval Reserve Training Center, constructed for the Tampa Port Authority/Peter Brown Construction, contains classrooms, high tech systems, offices, a large multipurpose room with a stage, an auditorium, lockers, and conference rooms. DETAILS: • Chiller plant •…

    Read more

  • Marine Corps Logistics Base Repairs

    Marine Corps Logistics Base Repairs

    ROLE: Consulting Contractor/Construction Manager for CL2 DESCRIPTION: Replace Water & Gas Lines, Area 3/Area 4 DETAILS: • Heavy Civil Construction • Large and Specialized Concrete Foundations/Underground Structures • Special water and natural gas piping • Railroad repairs • Approximately 10 linear…

    Read more

  • Metal Building

    Metal Building

    ROLE: Principal Contractor DESCRIPTION: Artec was the building specialty constructor of a “Kingspan System” metal building approx. 24,000 SF mixed-use office center consisting of shell build out, elevator and parking areas.

    Read more

  • Military Construction Projects

    Whether operating in wartime or peacetime conditions, ARTEC, has acquired a three-decade track record of success for performing supply and construction management and logistics and operational support for government and militaries worldwide. To date, ARTEC has successfully performed over 100…

    Read more

  • NAVFAC Bridge Crane Hanger

    NAVFAC Bridge Crane Hanger

    ROLE: Consulting Contractor/Construction Manager for CL2 DESCRIPTION: Design and Installation of a 5-Ton Bridge Crane Hanger Repair Fire Suppression Systems and Water Tank Weapons System Integration Facility Valve Isolation DETAILS: • Heavy Steel and Crane Construction • Top Security Isolated Island Mobilization…

    Read more

  • Oil & Gas

    Oil & Gas

    ARTEC has successfully completed highly complex engineering, procurement and construction projects for clients in remote and challenging locations across the globe. Whether it is a commercial initiative, or a secure government defense project, we deliver solutions that cater to the…

    Read more

  • PALM BEACH ATLANTIC UNIVERSITY ATHLETIC FIELD

    PALM BEACH ATLANTIC UNIVERSITY ATHLETIC

    Role: General Contractor Description: New construction and site work of a 17 acres for two softball fields, one baseball field, a varsity soccer/     lacrosse field, six tennis courts, a cross country course, and other support features such as outdoor batting cages,…

    Read more

  • Patrick AFB, Pararescue Training Facility

    Patrick AFB, Pararescue Training Facilit

    ROLE: Prime Contractor DESCRIPTION: New construction of an approximate 26,000 square foot facility with a separate 10,000 square foot Secured Mechanical Shop/Security Equipment Area: maintenance and storage amphibious and surface warfare equipment. Additionally, this highly secured and complicated facility included: Scuba Regeneration…

    Read more

  • Pt Mugu Hangar and Bridge Crane

    Pt Mugu Hangar and Bridge Crane

    ROLE: Principal contractor DESCRIPTION: Design and Installation of a 5-Ton Bridge Crane Hanger Repair Fire Suppression Systems and Water Tank Weapons System Integration Facility Valve Isolation DETAILS: • Heavy Steel and Crane Construction • Top Security Isolated Island Mobilization • Large and…

    Read more

  • Renovations for Van Wezel Performing Arts Hall

    Renovations for Van Wezel Performing Art

    Role: General Contractor Description: One (1) 60,000 square foot Performing Arts Hall- Project consisted of extensive renovations to the existing HVAC, plumbing and electrical system throughout the building and auditorium. Custom fabricated interior flooring and finishes to all levels and…

    Read more

  • State of Oklahoma Emergency 100 Ton Chiller Set

    State of Oklahoma Emergency 100 Ton Chil

    ROLE: Principal Contractor DESCRIPTION:  Emergency replacement of existing cooling and chilling system for the Library of the Blind. Involved new piping, structural retrofitting to roofing and building, upgrades of controls and electrical systems. $500,000.00

    Read more

  • TIE BREAKER SPORTS COMPLEX AND WATER PARK

    TIE BREAKER SPORTS COMPLEX AND WATER PAR

    Role: Construction Manager Description: This state-of-the-art recreational facility: State of the art five field softball complex with concession stand and scorekeeper booths, Family Aquatic Center, 3 single family picnic shelters, 2 sand volleyball courts, Paved walking trail (around the Softball…

    Read more

  • Transportation

    Coming soon!

    Read more

  • U.S. Central Command Headquarters, Interior/Exterior Repairs

    U.S. Central Command Headquarters, Inter

    ROLE: General Contractor DESCRIPTION: Completed alterations of US CENTCOM's ingress and egress areas, newly constructed bullet proof security area, installed explosion proof solarium and fragmentation film, new parking and landscaping areas. Acutely fine details associated with this project. Extensive work in…

    Read more

  • U.S. Coast Guard Naval Engineering Support Unit  Renovations

    U.S. Coast Guard Naval Engineering Suppo

    ROLE: Principal contractor DESCRIPTION: Renovations to Naval Engineering Support Unit Charleston's Maintenance Augmentation Team Detachment. The Artec Group furnished all labor, tools, equipment and materials for facility improvements to the administration offices, workshop upgrades, added toilet facilities and roof replacement. Other project specifics,…

    Read more

  • U.S. Department of Veterans Affairs

    U.S. Department of Veterans Affairs

    U.S. Department of Veterans Affairs   Bay Pines VA Center Area Renovation for PAC System  

    Read more

  • U.S. Department of Veterans Affairs

    U.S. Department of Veterans Affairs

    U.S. Department of Veterans Affairs James Haley VA Hospital IRMS Remodel  

    Read more

  • U.S. SOCOM HQ, Construct Acquisition & Logistics Center 306/306A

    U.S. SOCOM HQ, Construct Acquisition �

    ROLE: Consulting Contractor/Construction Manager for CL2 DESCRIPTION: • Exterior Force Protection Anti-Terrorist Standards • Bullet and Explosion Resistance Proofing • Heavy Building Construction • Security Intrusion Detection • Large and Specialized Concrete Foundations • CCTV Security Video Monitors • Bitumen Roofing…

    Read more

  • U.S. Special Forces Underwater Operations- Key West, Florida

    U.S. Special Forces Underwater Operation

    U.S. Special Forces Underwater Operations- Key West, Florida

    Read more

  • U.S. Special Operations Command, Public Access Building

    U.S. Special Operations Command, Public

    ROLE: General Contractor DETAILS:   Exterior Force Protection Anti-Terrorist Standards Interior Bullet and Explosion Proofing Heavy Building Construction Security Intrusion Detection Large and Specialized Concrete Foundations CCTV Security Video Monitors Bitumen Roofing Air Conditioning Special Fiber Optic and other computer IT…

    Read more

  • U.S. Special Operations Command- Medal of Honor Hall

    U.S. Special Operations Command- Medal o

    ROLE: Principal Contractor DESCRIPTION: Artec designed and constructed the US SOCOM HQ Museum to Honor Special Operations Forces Medal of Honor recipients. Consists of creative millworks, glass and glazing, photographs paintings, etc.  

    Read more

  • US 231 Welcome Center

    US 231 Welcome Center

    ROLE: Principal Contractor DESCRIPTION: Since 1949, millions of auto travelers entering Florida along the major thoroughfares have found a warm greeting at the Official Florida Welcome Centers. In addition to the traditional cup of complimentary Florida citrus juice, these visitors have…

    Read more

  • USCG Hangar and Bridge Crane

    USCG Hangar and Bridge Crane

    ROLE: Principal contractor DESCRIPTION: Design and Installation of a 5-Ton Bridge Crane Hanger Repair Fire Suppression Systems and Water Tank Weapons System Integration Facility Valve Isolation DETAILS: • Heavy Steel and Crane Construction • Top Security Isolated Island Mobilization • Large and…

    Read more